Partitions, Panelling & Ceilings

Acoustic Panelling & Partitions

Execution Rigor

Acoustic panelling, partitions and flooring

Wall cladding, timber slat panels, acoustic treatments, demountable partitions and flooring for commercial spaces

Get a Quote
Capabilities

Surface Execution Capabilities

Get a Quote
01

Acoustic Timber Slat Panelling

High-performance NRC-rated wooden acoustic slat panelling over black acoustic felt, perfect for auditoriums and conference suites.

02

Demountable Partitions

Timber and aluminium-framed partition walls with acoustic insulation infills for adaptable office departmental layouts.

03

Hardwood & Laminate Flooring

High-traffic commercial laminate, LVT, and engineered hardwood floor installation with laser-straight expansion profiles.

04

Fluted & Louvered Walls

Floor-to-ceiling decorative timber louvers, fluted MDF baffles, and back-lit architectural wall features.

05

Concealed Access Doors

Flush-to-wall secret doors with concealed SOSS/Tectus hinges maintaining unbroken wall panel grain lines.

06

Sub-Base Moisture Verification

Strict moisture and level testing of concrete screeds before floor laydown, preventing seasonal warping or buckling.

FAQs

Which materials do you use?

We build to your BOQ. Typical materials: BWP/BWR plywood, HDHMR and fire-retardant boards from certified brands, finished in laminate, veneer or PU.

How quickly can you start, and how long do projects take?

Crews are on site within 48–72 hours of drawing sign-off and site clearance. Typical duration: 2–4 weeks for office clusters, 2–6 months for multi-floor fit-outs.

Do you offer labour-only contracts?

Yes. We offer labour-only (client-supplied material) or full turnkey/item-rate contracts covering procurement, fabrication and installation.

Is the work supervised on site?

Yes. Dedicated trade supervisors oversee site operations daily against shop drawings, quality checklists and safety standards. In critical conditions, our senior specialists are also directly involved through to joint snag handover.